Steel Buildings & Carports

How It
Works

From design to installation, here's exactly what to expect when you order a steel building or metal carport from Benchmark Structures.

1
Design Your Building
Use our 3D configurator to design your steel building or carport to exact specifications — size, color, doors, windows, and more. Or work directly with our team to spec out a custom structure. Every build is made to order.
2
Place Your Order & Secure Permits
A deposit is required to begin fabrication. We assist with permit paperwork where required — most residential carports don't need a permit, but larger steel buildings typically do. We'll walk you through what's needed in your county.
3
Prepare Your Site
You're responsible for site prep before installation. We'll provide the exact specifications — most builds require a level gravel or concrete pad. Concrete is recommended for enclosed buildings. We can connect you with local contractors if needed.
4
Fabrication
Your steel building is fabricated to your exact order — galvanized steel framing, your choice of panel colors, and all specified openings. Typical fabrication and lead time is 4–8 weeks from order date depending on current demand.
5
Professional Installation
Our certified installation crew comes to your site and assembles the building from the ground up. Most installs take 1–3 days depending on size. The crew handles everything — you just need a clear, accessible site.
Site Prep Required
A level gravel or concrete pad is required before installation. We provide exact specs.
Permit Assistance
We assist with permit applications. Requirements vary by county and building size.
Lead Time
Typically 4–8 weeks from order to installation, depending on season and build complexity.
Certified Installers
Every build is installed by our certified crew. 1–3 day install for most projects.
Ready to Build?

Contact us at (843) 490-2488 or design your building now with our 3D configurator.